AOG: what happens in the first four hours
When an aircraft is grounded away from base, the first few hours decide how long it stays there. How the best maintenance teams organise the response.

- Get an accurate diagnosis before ordering parts, but start sourcing in parallel.
- Give one person ownership of the AOG event from start to release.
- Record the event in the system as it happens, not afterwards.
An aircraft on ground is expensive in more ways than one. Passengers are rebooked, crews go out of hours and the next day's schedule starts to unravel. The cost is driven largely by time, and much of that time is won or lost in the first few hours.
Hour one: understand the problem
The first job is an accurate diagnosis. The line engineer reports the defect, the fault messages and what has already been tried. Maintenance control checks the fleet history for the same fault, the troubleshooting manual and whether the item can be deferred under the MEL. A good diagnosis prevents the most expensive mistake in an AOG, which is flying the wrong part to the wrong place.
Give the event an owner
One person should own the AOG from start to release. They coordinate engineering, stores, procurement, logistics and operations, and they keep a single timeline of what has happened. Without an owner, several people chase the same supplier while nobody arranges transport.
Hour two: source in parallel
As soon as the likely part is known, check stock across all stations and pools, including serviceable units in other aircraft that could be robbed if policy allows. In parallel, request quotes from suppliers and exchange providers. Check the certificate requirements before accepting a unit, so that a part does not arrive and then wait in quarantine.
Hour three: move people and tools
If the station lacks the authorisation, the tools or the people, decide early whether to send a team. Book travel, tooling and any special equipment at the same time as the part, so that it all arrives together.
Hour four: tell people what to expect
Operations needs a realistic estimate of when the aircraft will return to service, with the assumptions behind it. A clear estimate that is updated as things change is more useful than an optimistic one that slips repeatedly.
Record as you go
- Log the defect, diagnosis and troubleshooting steps as they happen.
- Record the part sourcing decisions, costs and certificates against the event.
- Note any robbery of parts from other aircraft, so both aircraft records stay correct.
- Capture the release and the time back in service.
Learn from each one
After the event, look at where time was lost. Was the diagnosis slow? Was stock in the wrong place? Did a certificate cause a delay? Patterns across several AOG events often justify a change in stock levels at an outstation or a new exchange agreement.
Measures worth tracking
These measures help you see whether the approach is working. Track the trend over several months rather than reacting to a single figure.
More insights

Where AI helps in aircraft maintenance, and where it should not
AI is good at reading, sorting and spotting patterns. Airworthiness decisions still belong to qualified people. A practical view of where the line sits.
Read article
What technicians actually need from a mobile maintenance app
A tablet at the aircraft only helps if it is faster than paper. What matters to technicians, and what to test before you choose.
Read article
Working offline: keeping task cards moving where Wi-Fi does not reach
Hangars, ramps and outstations rarely have perfect coverage. How to plan for offline work so records stay complete and nobody waits for a signal.
Read article