AOG: what happens in the first four hours

When an aircraft is grounded away from base, the first few hours decide how long it stays there. How the best maintenance teams organise the response.

A
Anandbabu
28 Aug 20267 min read
Key points
  • Get an accurate diagnosis before ordering parts, but start sourcing in parallel.
  • Give one person ownership of the AOG event from start to release.
  • Record the event in the system as it happens, not afterwards.

An aircraft on ground is expensive in more ways than one. Passengers are rebooked, crews go out of hours and the next day's schedule starts to unravel. The cost is driven largely by time, and much of that time is won or lost in the first few hours.

Hour one: understand the problem

The first job is an accurate diagnosis. The line engineer reports the defect, the fault messages and what has already been tried. Maintenance control checks the fleet history for the same fault, the troubleshooting manual and whether the item can be deferred under the MEL. A good diagnosis prevents the most expensive mistake in an AOG, which is flying the wrong part to the wrong place.

Give the event an owner

One person should own the AOG from start to release. They coordinate engineering, stores, procurement, logistics and operations, and they keep a single timeline of what has happened. Without an owner, several people chase the same supplier while nobody arranges transport.

Hour two: source in parallel

As soon as the likely part is known, check stock across all stations and pools, including serviceable units in other aircraft that could be robbed if policy allows. In parallel, request quotes from suppliers and exchange providers. Check the certificate requirements before accepting a unit, so that a part does not arrive and then wait in quarantine.

Hour three: move people and tools

If the station lacks the authorisation, the tools or the people, decide early whether to send a team. Book travel, tooling and any special equipment at the same time as the part, so that it all arrives together.

Hour four: tell people what to expect

Operations needs a realistic estimate of when the aircraft will return to service, with the assumptions behind it. A clear estimate that is updated as things change is more useful than an optimistic one that slips repeatedly.

Record as you go

  • Log the defect, diagnosis and troubleshooting steps as they happen.
  • Record the part sourcing decisions, costs and certificates against the event.
  • Note any robbery of parts from other aircraft, so both aircraft records stay correct.
  • Capture the release and the time back in service.

Learn from each one

After the event, look at where time was lost. Was the diagnosis slow? Was stock in the wrong place? Did a certificate cause a delay? Patterns across several AOG events often justify a change in stock levels at an outstation or a new exchange agreement.

Measures worth tracking

These measures help you see whether the approach is working. Track the trend over several months rather than reacting to a single figure.

MeasureHow to measure itWhat it tells you
AOG durationHow to measure itHours from aircraft on ground to return to serviceWhat it tells youThe main measure of how well the response works
Time to diagnosisHow to measure itHours from the report to a confirmed fault and part numberWhat it tells youMost avoidable delay sits in this step
Wrong part dispatchedHow to measure itAOG events where the first part sent did not fix the faultWhat it tells youEach case usually traces back to a rushed diagnosis
AOG events per thousand flight hoursHow to measure itNumber of AOG events against fleet utilisationWhat it tells youTracks whether prevention, stock and reliability work is paying off
A
Anandbabu

Writes about aviation maintenance, airworthiness and the software that supports the people who do the work.

See how Supersonic handles thisA 45 minute walkthrough using your aircraft types and workflows.
Book a demo